General Information:
City: Shimla
Climate: Cold
Operational schedule – 24 hours, 7 working days in a week
Area of the building: 10000m² (out of which 8000 m² - conditioned
area, 2000 m² - non-conditioned area)
Function: Hotel
Walls
|
Roof
200mm concrete slab with U- value higher than
that of the ECBC recommended
|
|
Window
6mm clear single glazed window in thermally unbroken aluminium
frames (SC – 0.89, Clear single glazed window increases the solar heat gain which
is an advantage in cold climate. WWR is in the limits of ECBC recommended
(max 40%) |
||
Building Lighting |
||
Lighting controls
|
HVAC system Design
|
|
Energy Performance of the BuildingLighting Energy Performance of the Building
• Space Conditioning Energy Performance of the Building
|
||
| Energy Performance Index of the building (KWh/Sq.mts of
built up area/annum): 237 |
||